Speculative Industrial units, Chelmsford, Essex
Client: Royal London Size: 3,000sqm Program: 38 weeks MDCL secured this tendered contract to build 2 fully fitted speculative industrial units as the last phase of Springfield Business Park in Chelmsford for Royal London. The scheme was completed on time and to budget.
Last Mile Logistics Distribution Hub, Basildon
Client: Rex Developments Size: 5,000sqm Program: 38 weeks MDCL secured this tendered contract to build an industrial unit on Grays Road, Basildon. It is designed as a “last mile” logistics unit with 3 docks and level loading capability. A highly specified office content was also provided. All completed on time and to budget.
Trade Counter Scheme, Wrotham, Kent
Client: Woolbro Ltd Size: 2,758sqm Program: 34 weeks MDCL secured this tendered contract to build 2 industrial buildings, split into 6 units with shell first floor offices. The site suffered from desiccation and needed significant remediation. All finished on time and to budget.
Trade Counter and Retail Park, Fleet, Hampshire
Client: MHA London Ltd Size: 7,000sqm Program: 42 weeks MDCL secured this tendered contract to build a terrace of trade counter units, an Aldi and Home Bargains in Church Crookham, Hampshire. Post demolition there was some significant remediation and shoring that had to be completed to allow development to occur. The scheme was completed on time and […]
Industrial/Trade Counter/Builders Merchant Scheme – Rochester
Client: Location 3 Properties Ltd/Hermes (HPUT) Size: 14,783sqm Program: 52 weeks MDCL secured this tendered contract to build 4 industrial buildings, split into 8 units with fully fitted first floor offices. Units are let to Selco, Sainsbury’s Argos and Wurth. The site required significant remediation and services relocated. The site was landfill and as such the whole site […]
Logistics Park, Dartford
Client: Newable Developments Ltd Size: 5,783sqm Program: 48 weeks MDCL secured this tendered contract to build 5 industrial units with fully fitted first floor offices. The site required significant remediation with a layer of peat at depth having to be removed before the site could be stabilized. The scheme was built on time and budget.
Aldi Food Retail Store and Industrial/Trade Counter Units, High Wycombe
Client: LxB, Berkeley Square Common Investment Fund Size: 3,000sqm Program: 32 weeks MDCL won this competitive tender to build an Aldi food store and 3 small terraced industrial units with fully fitted offices. The ground was poor and required remediation post demolition. A new sheet piled wall was also installed to stabilize the existing retaining wall along […]
Burndown Rebuild, Festival Way, Basildon
Client: Clearbell Size: 3,800sqm Program: 32 weeks MDCL won this competitive tender to rebuild a burnt down logistics warehouse and offices. Located at Festival Place, Basildon. The ground was poor and required improvement before any construction could commence. The offices were fully fitted ready for the in going tenant.
Manufacturing facility with offices, Braintree
Client: Marshgate Group Size: 6,790sqm Program: 40 weeks MDCL won this competitive tender to design and build a large manufacturing premises with fully fitted offices. The unit was pre let to Weston Homes Plc.
New Extension to an Old Friend in Erith, Kent
Client: Compagnie Du Parc Size: 1,500sqm Program: 30 weeks MDCL negotiated this scheme with a European fund to extend a building MDCL built 13 years previously.