Operating for over 40 years in Commercial Construction

Steel Processing Plant with Offices, Shoreham Port

Client: J Parker & Son Ltd/Shoreham Port Authority

Size: 120,000sqft

Program: 50 weeks

MDCL secured this tendered job on Shoreham Port land to design and build a new 120,000sqft  automated steel processing plant. The building was piled and allowed for three 50T cranes to run up and down each portal frame.  The 40m long roof sheets were rolled on site and crane lifted into place. An external weighbridge and gatehouse was also included.

LinkedIn